Physical Address
AECI Place, 24 The Woodlands, Woodlands Drive, Woodmead, Sandton, South Africa, 2191
Postal Address
Private Bag X21, Gallo Manor, 2052
We implemented the Intellishot® electronic initiation system to resolve longstanding issues with fragmentation, perimeter control and safety. The previous shock tube method created timing mismatches and out-of-sequence blasts, which limited wall control and reduced fragmentation quality. The operation increased blast sizes from 40 000 to 110 000 bank cubic metres (bcm) and reduced blasting frequency from 10 to six blasts per month.
The ore powder factor improved from 1.8kg to 1.61kg per bcm, reducing the amount of explosive required while maintaining the same fragmentation performance.
95% Fragmentation consistency (up from 75%)
+25% Excavator productivity
+5 yrs Mine life extended
“The Intellishot® System is a game changer for our operations. It has transformed the way we approach blasting, improving safety, efficiency and fragmentation, while allowing us to achieve higher productivity with greater control over each blast.”
– Mine Management, DGZ Eureka Gold Mine